Skip to content

ZarSage · One farm record

The farm app for the field and the desk.
And asks before it acts.

Open ZarSage on your phone in the field. Sign in on a computer with the same account and your fields are already there.

Or add it to ChatGPT or Claude
  • 7-day free trial
  • iPhone, Android and web
  • Works with no signal
The ZarSage web console behind the phone: the same farm record on the desk and in the field.

Your morning, in one screenWhat needs you, in one listEvery field and its cycleAsk before you sprayNews for your crop and countryWorks with no signalConnect it to your assistant

Console captured from a real ZarSage organisation on 14 Oct 2026.

How it fits together

One record, three ways in.

Your phone, the web console and your assistant work from the same farm record, so a note made in the row is on the desk the moment it uploads.

ZarSage farm recordEvidence · Permissions · History
  • Phone appField work saves offline and syncs when connected
    In the field
    At the field edge
  • Web consoleWhere you plan, file documents and manage your subscription
    The ZarSage web console Overview: members, fields against the plan limit, and the items that need a decision.
  • ChatGPT or ClaudeConnected through ZarSage Connect

Illustrative demo screens from separate sessions.

Meet Zari

Your field companion.

Zari is who you meet when you open ZarSage Mobile. It keeps an eye on every field and sits with you through the morning briefing: your fields, the forecast and the day’s work, read aloud. This one is real: press play.

ZarSage · North Field · recorded 14 Oct 2026 from its own data0:00 / 0:18

Read the transcript

Good morning. North Field looks steady today. Your maize is fifty-seven days in, around flowering by our day count, and harvest is expected near the twenty-fourth of November. About thirteen millimetres of rain fell yesterday, and the next few days stay light, so there's no need to irrigate this week.

Pick a status to hear its briefing. The forecast figures are from 14 Oct 2026 and change daily.

Pick your companion

Zari: a character that keeps an eye on your fields.

One light, four states

Not checked yet: Zari has not assessed this field.

What Zari does

  1. Checks every fieldEach field card says what Zari checked last and what is coming, like rain on Saturday.
  2. Moves with your briefingPress play: while the ZarSage voice reads the morning briefing, Zari follows the words, as on the app's voice screen.
  3. Shows its sourcesEvery finding comes with the sources behind it, and a change Zari proposes waits for your approval.

Now on your phone

Built for the day in the field.

ZarSage fits the farm’s work into the moments you already have. Explore what that looks like across a day in the field.

1 / 9
Before you leave

Your morning, in one screen

You’re up before the light. Zari has already checked your fields: the weather, what needs a look and each field’s briefing are there before you reach the first field.

At the desk
The ZarSage web console Overview: members, fields against the plan limit, and the items that need a decision.

The same morning, on the desk

Sign in on a computer and the morning is already there: members, fields against the plan, and what needs a decision across every field.

In the field

What needs you, in one list

Reviews, due work and missing evidence wait in Attention, each with its field. When a recommendation needs a fact only you know, its question waits there too.

At the desk
The console Overview: one active member, 1 of 60 pooled fields, no decision waiting, why North Field has no clear satellite view since 24 Aug, then two items that need attention: a second administrator and a soil sample not yet lab-confirmed.

What needs a decision, across every field

Scouting thresholds, overdue work, overlapping parcels and unconfirmed soil results rise to the top, each with the fields and evidence behind it.

At the field edge

Every field and its cycle

Open the field you’re standing in: its boundary, crop stage, soil status and every application, linked to that field and nothing else.

Before you spray

Ask before you spray

Every morning’s briefing stays in one dated thread. Ask in plain words, like whether you can spray this week, and the answer comes from your field’s own forecast, day by day. It screens the weather; it never authorizes a treatment.

Over lunch

News for your crop and country

A daily digest of what matters to what you grow and where you grow it. Each story carries its sources and reads fine offline.

No signal

Works with no signal

Log the spray, the scouting note, the hours. It’s saved on the phone and uploads in order when you’re back in range; nothing waits on the network.

Back at the table

Connect it to your assistant

Open ZarSage Connect in the app, copy the endpoint into ChatGPT or Claude, and see exactly what the assistant may read and write before it reads anything.

Get the app7-day free trial · iPhone and Android

Web console · Same account

Connected to the data you already have.

Sign in at the desk with the account you use in the app. Your fields are already there, and so is everything that feeds them.

01Connectors

One record, filled by the sources you already use.

Sensor readings, shared drives, satellite passes, weather and soil models land in the same record, on the right field, so nobody retypes anything.

  • Sensors, documents, satellite, weather and soil
  • Each reading lands on its field, with its date and source
  • The same record your phone and your assistant read
How the connector works

Sources

  • SensorsField sensors and loggers
  • DocumentsShared drives and uploads
  • SatellitePasses over every field
  • WeatherForecasts and history
  • SoilLab reports and soil models
  • And moreNew sources join the record over time
ZarSage farm recordEvidence · Permissions · History
Open the web console

Paid organizations include unlimited team members. Fields, hectares, uploads and AI allowances are shared across your organization. See Pricing

Run a co-op or an NGO? See how we work with you

ZarSage Connect

Your farm speaks. Your assistant understands.

Ask naturally in ChatGPT or Claude. ZarSage finds the permitted farm context, attaches the evidence, and brings a grounded answer back to the conversation.

One farm record. Any assistant.

Your farm record, available wherever you work with AI

Field boundaries
Soil lab results
Weather and satellite
Crop and work history
ZarSageZarSage farm recordPersistent · source-linked · permissioned
Relevant evidence retrieved
Nothing is changed without your approval

Set up ZarSage Connect

Connect your assistant.

Choose ChatGPT or Claude for the setup steps. Availability depends on your account and workspace settings.

Claude

Works on a free account

Recommended for individual farmers. Claude supports custom connectors on every plan. Free accounts can add one; Team and Enterprise owners must add ZarSage for their organization first.

https://app-api.zarsage.ai/v1/mcp
  1. Open Claude web at claude.ai. On Free, Pro, or Max, open Customize → Connectors, then select Add → Add custom connector.
  2. Team or Enterprise owner: open Organization settings → Connectors, select Add → Custom → Web.
  3. Name it "ZarSage," enter the server URL: https://app-api.zarsage.ai/v1/mcp. Then select Add.
  4. Continue with Google when the sign-in window opens. If it does not appear, select Connect on the ZarSage row. Team or Enterprise members start here: open Customize → Connectors, find ZarSage, then select Connect.
  5. Enable ZarSage for a conversation from + → Connectors.

New subscribers start with a 7-day free trial on one field. Plans are sized by farm, up to 300 hectares. Assistant availability and permissions follow each host's account and workspace settings. Stuck on a step? Email us and a person will help.

Start with a real job

Three useful first prompts.

The assistant will retrieve what ZarSage already knows, ask only for missing information, and request confirmation before it writes.

Set up my farm
Set up my farm in ZarSage. Start with my field and its exact boundary, then save any soil lab results, resource notes, and source links I provide. Ask only for information that is still missing, and show me each change before saving it.
Analyze a field
Analyze my field named [field name]. Use its crop and work history, soil evidence, recent and forecast weather, and available satellite observations. Show the evidence, sources, confidence, and data gaps, using charts, maps, tables, or images where they help.
Plan a crop cycle
Help me plan the next crop cycle for [field name]. Use ZarSage's farm evidence and current crop-suitability data, ask about any constraints that materially change the plan, and present a complete draft with tasks and reasoning before asking me to confirm it.

Trust the answer

Evidence you can inspect. Control you can keep.

Your assistant handles the conversation and presentation. ZarSage protects the farm record, permissions, source evidence, and execution receipts behind it.

  • SourcesSources stay visible

    Important claims include timestamps, units, provenance, confidence, and known data gaps.

  • WritesWrites stay controlled

    Write tools require separate permission. Some workflows enforce a server-side confirmation step; your assistant may also ask before acting.

  • TenancyFarm data stays isolated

    Each account and organization is checked on every request; files remain private and tenant-scoped.

  • AccessAccess is reversible

    Sign in with Google, review the requested scopes, and disconnect the assistant whenever you choose.

Co-ops and NGOs

Run every farm you support.

Your team plans in the web console. Field staff and farmers work on their phones, even with no signal. Everyone reads and writes the same farm record.

  • TeamUnlimited members for paid organizations; one shared resource allowance
  • ScaleMore than 300 hectares? We size a plan with you
  • ControlAdmins decide; nothing is written without permission

Tell us about your farms.

Send us your farm size, or how many farmers you work with, and we will set it up with you.

Talk to us

Questions

Before you ask.

Does Zari talk?

No. Zari is the character in the app. The morning briefing is read by the ZarSage voice, and Zari moves with it; it never speaks for you or to you.

Does the app work with no signal?

Yes. Log work in the field; it is saved on the phone and uploads in order when you are back in range. Today, your fields and the digest stay readable offline.

Which phones?

iPhone and Android. Tap Get the app and follow the steps for your phone. Every plan starts with a 7-day free trial on one field.

Which assistants does ZarSage Connect work with?

ChatGPT and Claude. You add the ZarSage server URL as a connector; what each host allows depends on your account and workspace settings. The setup steps above walk through both.

Can an assistant change my farm record without asking?

No. Write tools need separate permission, some workflows enforce a server-side confirmation, and a change Zari or the assistant proposes waits for your approval.

What does it cost?

New subscribers start with a 7-day free trial on one field. Plans are sized by farm, up to 300 hectares; see Pricing for the ladder.

Is there a web version?

Yes. The web console opens in any browser on a computer. Sign in with the same Google or email account as the app and your fields, documents and plan are already there.

I run a co-op, an NGO or a farm business.

The web console runs every farm you support from one screen, while field staff and farmers work on their phones. Every plan covers your team; for more than 300 hectares, write to hello@zarsage.ai.

Take Zari with you

Meet Zari in your fields.

ZarSage Mobile is on iPhone and Android with a 7-day free trial on one field, and the web console opens with the same account. Or start by adding your farm record to ChatGPT or Claude.